![]() |
| TABLE 10 | ||||||||||||
| NICKEL: WORLD MINE PRODUCTION, BY COUNTRY1, 2 | ||||||||||||
| (Metric tons of contained nickel) | ||||||||||||
| Country and products3 | 2009 | 2010 | 2011 | 2012 | 2013 | |||||||
| Albania, laterite oree | 1,000 | 3,000 | 3,000 | r | 2,000 | r | 2,000 | p | ||||
| Australia, ores and concentrate4 | 165,000 | 170,100 | r | 215,000 | r | 246,000 | 234,234 | |||||
| Botswana, ore milled | 28,595 | 24,931 | r | 15,675 | 17,948 | 22,848 | p | |||||
| Brazil, ore | 41,059 | 108,983 | 131,673 | 139,230 | 104,829 | p | ||||||
| Burma, oree, 5, 6 | 10 | -- | 800 | 5,000 | 9,300 | p | ||||||
| Canada, concentrate | 135,037 | 160,063 | 219,025 | 211,701 | r | 223,295 | ||||||
| Chinae | 84,800 | 79,600 | r | 89,800 | r, p | 93,300 | 107,000 | |||||
| Colombia, laterite oree | 79,900 | r | 76,200 | r | 76,000 | r | 84,000 | 84,700 | ||||
| Cuba, recoverable laterite:e | ||||||||||||
| Limonitic | 32,100 | 32,500 | 38,100 | 35,700 | 34,500 | |||||||
| Serpentinic | 37,900 | 37,200 | 34,400 | 32,500 | 31,500 | |||||||
| Total | 70,000 | 69,700 | 72,500 | 68,200 | 66,000 | |||||||
| Dominican Republic, laterite ore | 500 | -- | 21,693 | 25,590 | 15,825 | |||||||
| Finland, concentrate7 | 4,400 | r | 29,448 | 63,209 | 46,755 | 46,000 | e | |||||
| Greece, laterite ore | 10,203 | 16,345 | 21,710 | 21,980 | r | 19,100 | e | |||||
| Guatemala, laterite ore | -- | -- | -- | 2,400 | r, p, 8 | 10,200 | e | |||||
| Indonesia, laterite ore9 | 202,800 | 300,800 | r | 564,400 | r | 648,400 | r | 834,200 | ||||
| Kazakhstan, laterite oree | 500 | 500 | 500 | 450 | 450 | |||||||
| Kosovo, laterite ore | 10,423 | r | 9,081 | r | 7,728 | r | 4,436 | r | 7,606 | |||
| Macedonia, ferronickel produced10 | 11,762 | r | 14,413 | 17,292 | 19,427 | 20,001 | ||||||
| Madagascar, laterite ore | -- | 2,000 | e | 5,900 | 8,365 | r | 29,248 | |||||
| Morocco, nickel sulfate | 733 | 317 | 217 | 288 | r | 175 | ||||||
| New Caledonia, ore | 95,649 | r | 131,309 | r | 128,732 | r | 131,693 | r | 164,406 | p | ||
| Norway, concentrate | 336 | r | 351 | 339 | 351 | 335 | ||||||
| Papua New Guinea, ore | -- | -- | -- | 5,283 | r, 11 | 11,369 | 11 | |||||
| Philippines: | ||||||||||||
| Laterite ore12, 13 | 122,709 | r | 153,679 | r | 296,569 | 293,731 | 289,613 | |||||
| Concentrate14 | 17,035 | r | 19,312 | r | 22,794 | 23,890 | 26,020 | |||||
| Total | 139,744 | r | 172,991 | r | 319,363 | 317,621 | 315,633 | |||||
| Russia, marketable mine production: | ||||||||||||
| Laterite ore15 | 32,298 | r | 41,184 | r | 41,777 | 28,210 | 27,500 | e | ||||
| Sulfide concentrate16 | 229,493 | 228,093 | 225,616 | 217,085 | 215,000 | e | ||||||
| Total | 261,791 | r | 269,277 | r | 267,393 | 245,295 | 243,000 | e | ||||
| South Africa, concentrate | 34,605 | 39,960 | 43,321 | 45,945 | 51,208 | |||||||
| Spain, concentrate17 | 8,035 | 5,402 | r | -- | 2,397 | r | 7,564 | |||||
| Turkey, laterite oree | 1,199 | r, 18 | 1,900 | r | 4,300 | r | 3,490 | r | 3,500 | |||
| United States, concentrate | -- | -- | -- | -- | 4,090 | 19 | ||||||
| Venezuela, laterite ore | 13,200 | r | 11,400 | 19,500 | 6,060 | 6,000 | e | |||||
| Vietnam, concentrate | -- | -- | -- | 335 | 6,932 | |||||||
| Zambia, concentrate20 | 280 | e | 2,482 | 2,724 | -- | -- | ||||||
| Zimbabwe, concentrate | 4,858 | 6,200 | e | 7,992 | 7,899 | 14,058 | ||||||
| Total, grand | 1,410,000 | r | 1,710,000 | r | 2,320,000 | r | 2,410,000 | r | 2,660,000 | |||
| Of which: | ||||||||||||
| Concentrate21 | 434,000 | r | 491,000 | r | 585,000 | 556,000 | r | 595,000 | ||||
| Ore and ore milled22 | 165,000 | r | 265,000 | r | 277,000 | r | 299,000 | r | 313,000 | |||
| Laterite ore | 545,000 | r | 686,000 | r | 1,140,000 | r | 1,200,000 | r | 1,400,000 | |||
| Ferronickel produced | 11,800 | r | 14,400 | 17,300 | 19,400 | 20,000 | ||||||
| Nickel sulfate | 733 | 317 | 217 | 288 | r | 175 | ||||||
| Unspecified and (or) undifferentiated23 | 250,000 | r | 250,000 | r | 305,000 | r | 339,000 | r | 341,000 | |||
| eEstimated. pPreliminary. rRevised. -- Zero. | ||||||||||||
| 1Grand totals and estimated data are rounded to no more than three significant digits; may not add to totals shown. | ||||||||||||
| 2Insofar as possible, this table represents recoverable mine production of nickel. Where actual mine output is not available, data- | ||||||||||||
| related to a more highly processed form have been used to provide an indication of the magnitude of mine output and this- | ||||||||||||
| is noted.- | ||||||||||||
| 3North Korea may have an active nickel mine, but information is inadequate to make reliable estimates of output. Includes | ||||||||||||
| -data available through October 16, 2015. | ||||||||||||
| 4Australian Bureau of Agricultural and Resource Economics (ABARE) data for mines in Western Australia and Tasmania. | ||||||||||||
| TABLE 10-Continued | ||||||||||||
| NICKEL: WORLD MINE PRODUCTION, BY COUNTRY1, 2 | ||||||||||||
| 5Burma-s new Tagaung Taung Mine is a joint project of the Government of Burma, China-s Taiyuan Iron & Steel, and the China- | ||||||||||||
| Nonferrous Metal Mining Group (CNMC). The joint venture officially began recovering laterite ore on March 27, 2011. | ||||||||||||
| The nickel content of the ore mined and the nickel content of ferronickel produced were reported by the Government.- | ||||||||||||
| 6Numbers have been adjusted to take into account data received from individual company sources as well as trade statistics. | ||||||||||||
| 7The gross weight of concentrates processed in Finland from domestic ores was, in metric tons, as follows: 2009-43,000 | ||||||||||||
| -(estimated); 2010-43,151; 2011-87,974; 2012-99,089; and 2013-137,911. | ||||||||||||
| 8In 2012, Cunico Resources Group N.V. acquired Guaxilan, S.A. and began mining high-grade saprolitic ores for export to | ||||||||||||
| Eastern Europe. Solway Investment Group Ltd. was also active in Guatemala and began upgrading the long-dormant Fenix Mine | ||||||||||||
| and ferronickel plant west of El Estor. | ||||||||||||
| 9Includes a small amount of cobalt that was not recovered separately. | ||||||||||||
| 10Cunico Resources Group extracts nickel ore from its open pit Rzanovo Mine and transports the ore by conveyor to its FeNi | ||||||||||||
| Industries pyrometallurgical facility in Kavadarci. At the Kavadarci plant, the Rzanovo ore is blended with higher grade imported- | ||||||||||||
| ores from Albania, Indonesia, New Caledonia, and Turkey to optimize production. | ||||||||||||
| 11In 2012, the Ramu joint venture began piping slurried ore from the new Kurumbukari Mine to the treatment plant at Basamuk | ||||||||||||
| for leaching in autoclaves. | ||||||||||||
| 12Source: Philippines Mines and Geosciences Bureau. Significant discrepancies exist between two data series owing to a number | ||||||||||||
| of factors. These factors include (1) end-of-year delays and carryovers; (2) excess water absorption on exposed landing craft | ||||||||||||
| vessels and barges; and (3) possible irregularities in submitting customs documents, with regard to country of origin or type of- | ||||||||||||
| ore. | ||||||||||||
| 13The bulk of the ore production is unprocessed, or minimally processed, direct-shipping ores. | ||||||||||||
| 14Nickel content of concentrate produced at Rio Tuba in 2009-13 by Coral Bay Nickel Corp. | ||||||||||||
| 15Nickel content of ore mined in the Ural Mountains region. | ||||||||||||
| 16Nickel content of concentrate produced on the Kola and Taimyr Peninsulas. | ||||||||||||
| 17In December 2010, Rio Narcea Recursos, S.A. suspended production at its Aguablanca open pit mine after heavy rainfall- | ||||||||||||
| caused a major slope failure on the main access ramp. Mining resumed in August 2011, but milling operations did not- | ||||||||||||
| restart until the third quarter of 2012. | ||||||||||||
| 18Reported figure. | ||||||||||||
| 19In 2013 Lundin Mining Co. began recovering nickel-copper ore from the Eagle Mine in Michigan. The concentrator at the- | ||||||||||||
| Humboldt mill, however, did not begin processing the ore until the third quarter of 2014. The nickel content of the ore was | ||||||||||||
| 4,093 metric tons. | ||||||||||||
| 20Albidon Limited concentrates were shipped to Jinchuan, China. First production was in June 2008. The concentrate produced- | ||||||||||||
| in 2010 averaged 8.39% nickel. The Munali Mine was on care and maintenance from March to December 2009 until- | ||||||||||||
| rampup problems were resolved and world nickel prices recovered.- | ||||||||||||
| 21Includes -Russia, sulfide concentrate.- | ||||||||||||
| 22Excludes -Australia, ores and concentrate.- | ||||||||||||
| 23Includes -Australia, ores and concentrate.- | ||||||||||||
Source: United States Geological Survey Mineral Resources Program
See also: Mineral commodity prices