West Bank and Gaza - Time required to build a warehouse
Time required to build a warehouse (days)
Time required to build a warehouse (days) in West Bank and Gaza was 108.00 as of 2019. Its highest value over the past 14 years was 109.00 in 2014, while its lowest value was 108.00 in 2015.
Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.
Source: World Bank, Doing Business project (http://www.doingbusiness.org/).