North Macedonia - Rail lines
Rail lines (total route-km)
The value for Rail lines (total route-km) in North Macedonia was 683.00 as of 2019. As the graph below shows, over the past 24 years this indicator reached a maximum value of 699.00 in 2014 and a minimum value of 683.00 in 2015.
Definition: Rail lines are the length of railway route available for train service, irrespective of the number of parallel tracks.
Source: Internation Union of Railways (UIC)
See also:
| Year | Value |
|---|---|
| 1995 | 699.00 |
| 1996 | 699.00 |
| 1997 | 699.00 |
| 1998 | 699.00 |
| 1999 | 699.00 |
| 2000 | 699.00 |
| 2001 | 699.00 |
| 2002 | 699.00 |
| 2003 | 699.00 |
| 2004 | 699.00 |
| 2005 | 699.00 |
| 2006 | 699.00 |
| 2007 | 699.00 |
| 2008 | 699.00 |
| 2009 | 699.00 |
| 2010 | 699.00 |
| 2011 | 699.00 |
| 2012 | 699.00 |
| 2013 | 699.00 |
| 2014 | 699.00 |
| 2015 | 683.00 |
| 2016 | 683.00 |
| 2017 | 683.00 |
| 2018 | 683.00 |
| 2019 | 683.00 |
Classification
Topic: Infrastructure Indicators
Sub-Topic: Transportation