Morocco - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Morocco was 58.00 as of 2019. Its highest value over the past 14 years was 115.00 in 2006, while its lowest value was 53.00 in 2018.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 115.00
2006 115.00
2007 105.00
2008 105.00
2009 105.00
2010 105.00
2011 68.00
2012 68.00
2013 68.00
2014 59.00
2015 56.00
2016 53.50
2017 53.50
2018 53.00
2019 58.00