Moldova - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Moldova was 278.00 as of 2019. Its highest value over the past 14 years was 341.00 in 2010, while its lowest value was 278.00 in 2019.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 341.00
2006 341.00
2007 341.00
2008 341.00
2009 341.00
2010 341.00
2011 310.00
2012 310.00
2013 310.00
2014 310.00
2015 310.00
2016 310.00
2017 310.00
2018 310.00
2019 278.00