Malaysia - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Malaysia was 41.00 as of 2019. Its highest value over the past 14 years was 285.00 in 2007, while its lowest value was 41.00 in 2019.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 285.00
2006 285.00
2007 285.00
2008 261.00
2009 261.00
2010 261.00
2011 172.00
2012 127.00
2013 109.00
2014 78.00
2015 78.00
2016 77.00
2017 77.00
2018 42.00
2019 41.00