Time required to build a warehouse (days) in Djibouti was 146.00 as of 2019. Its highest value over the past 14 years was 192.00 in 2013, while its lowest value was 146.00 in 2015.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 187.00
2006 187.00
2007 192.00
2008 192.00
2009 192.00
2010 192.00
2011 192.00
2012 192.00
2013 192.00
2014 147.00
2015 146.00
2016 146.00
2017 146.00
2018 146.00
2019 146.00