Time required to build a warehouse (days)

Time required to build a warehouse (days) in Montenegro was 102.00 as of 2019. Its highest value over the past 13 years was 229.00 in 2011, while its lowest value was 102.00 in 2019.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2006 195.00
2007 195.00
2008 226.00
2009 229.00
2010 229.00
2011 229.00
2012 227.00
2013 167.00
2014 167.00
2015 152.00
2016 152.00
2017 152.00
2018 107.00
2019 102.00