Brazil - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Brazil was 338.37 as of 2019. Its highest value over the past 6 years was 338.37 in 2019, while its lowest value was 338.37 in 2013.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2013 338.37
2014 338.37
2015 338.37
2016 338.37
2017 338.37
2018 338.37
2019 338.37

Classification

Topic: Private Sector & Trade Indicators

Sub-Topic: Business environment