Time required to build a warehouse (days) in Albania was 228.00 as of 2014. Its highest value over the past 9 years was 321.00 in 2006, while its lowest value was 228.00 in 2014.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).

See also:

Year Value
2005 321.00
2006 321.00
2007 320.00
2008 320.00
2009 320.00
2010 320.00
2014 228.00