Albania - Time required to build a warehouse

Time required to build a warehouse (days)

Time required to build a warehouse (days) in Albania was 331.00 as of 2010. Its highest value over the past 5 years was 332.00 in 2006, while its lowest value was 331.00 in 2007.

Definition: Time required to build a warehouse is the number of calendar days needed to complete the required procedures for building a warehouse. If a procedure can be speeded up at additional cost, the fastest procedure, independent of cost, is chosen.

Source: World Bank, Doing Business project (http://www.doingbusiness.org/).